Construction Cost $17.5 million
WisDOT – NE Region
Scope of Services
Construction Management
InspectionsMaterials Testing

K. Singh was hired by WisDOT as a member of BES Consultants, LLC to provide construction management services for the USH 45 and STH 41 Interchange as part of the USH 41 Freeway expansion project in Winnebago County.

  • Marsh Excavation
  • Concrete Pavement (Quarter of Mile)
  • Lake Butte de Morts Settlement
  • Borrow
  • Select Borrow
  • F Ramp Box Culvert (USH 41 Northbound to USH 45 Northbound)
  • USH 45 Northbound to USH 41 Southbound Bridge ARamp (3 Span, 35-feet x 187-feet)
  • Lake Butte des Morts Drive Bridge (4 Span, 430-feet by55-feet)
  • Community Sensitive Design Construction
  • Complex Erosion Control
  • Equalizer Pipes for Lake Butte des Morts
  • Lake Butte de Morts fill inspection
  • Lake Butte de Morts Box Culvert (260-feet x 30-feet)

The project was successfully completed and received an award from WisDOT for completing the project within the budget and on schedule.