KSingh was retained by the State of Wisconsin Department of Administration and UW-Madison as part of a team to provide civil engineering and land surveying services for this advanced planning… Read the full article.
KSingh was retained by the Division of Facilities Development as part of a design team led by HGA to provide civil engineering, geotechnical engineering, and land survey for this $13… Read the full article.
KSingh was retained as part of a team to design the replacement of steam lines on Park Street and Johnson Street on UW’s campus. This involves replacement of several pits… Read the full article.
KSingh was retained as part of a team by the Division of Facilities Development to provide survey, civil, geotechnical and structural engineering services for this utility relocation project at Mendota… Read the full article.
KSingh provided civil engineering services for this power plant improvement project located in the City of Wauwatosa. The project consisted of conversion of the power plant from coal burning to… Read the full article.
Milwaukee Metropolitan Sewerage District retained KSingh to design the relocation of a 24-inch diameter clay MIS in order to accommodate a building expansion project at the Clement J. Zablocki Veterans… Read the full article.
KSingh designed the rehabilitation and waterproofing for the main steam tunnel that carries steam from UW Parkside’s central plant to campus buildings. As part of this project, KSingh analyzed the… Read the full article.
KSingh provided civil and structural engineering services for this project which involved the utility distribution design for extending steam and chilled water to accommodate the future expansion of the Children’s… Read the full article.
KSingh was retained by MRMC to provide survey, civil engineering, storm water management, and geotechnical engineering services for this $150 million dollar utility distribution project. The project consisted of installation… Read the full article.
KSingh was retained by the Division of Facilities Development to prepare a sewer reconnection design study on the State Fair Park Fairgrounds. KSingh completed a concept design study that connects… Read the full article.
KSingh’s team provided site and civil engineering services for a new Law Enforcement Center in the City of Greenfield. Parking lots, driveways, sidewalks, and storm water BMPs were designed to… Read the full article.
KSingh led the design and installation of two 20,000-gallon USTs at the northeast corner of St. Joseph Hospital in the City of Milwaukee to meet the future projected fuel capacity… Read the full article.