Blog Archives


uw madison engineering building

UW Madison Engineering Drive Utilities

KSingh was retained by the State of Wisconsin Department of Administration and UW-Madison as part of a team to provide civil engineering and land surveying services for this advanced planning… Read the full article.

winnebago mental health institute

Winnebago Mental Health Institute

KSingh was retained by the Division of Facilities Development as part of a design team led by HGA to provide civil engineering, geotechnical engineering, and land survey for this $13… Read the full article.

UW madison sellery hall

UW Madison Sellery Hall

KSingh was retained as part of a team to design the replacement of steam lines on Park Street and Johnson Street on UW’s campus. This involves replacement of several pits… Read the full article.

mendota mental health institute

Mendota Mental Health Institute

KSingh was retained as part of a team by the Division of Facilities Development to provide survey, civil, geotechnical and structural engineering services for this utility relocation project at Mendota… Read the full article.

MRMC

Milwaukee County Permanent Plant Upgrades

KSingh provided civil engineering services for this power plant improvement project located in the City of Wauwatosa. The project consisted of conversion of the power plant from coal burning to… Read the full article.

va hospital

Veterans Affairs Hospital

Milwaukee Metropolitan Sewerage District retained KSingh to design the relocation of a 24-inch diameter clay MIS in order to accommodate a building expansion project at the Clement J. Zablocki Veterans… Read the full article.

uw parkside utility distribution

UW Parkside Utility Distribution

KSingh designed the rehabilitation and waterproofing for the main steam tunnel that carries steam from UW Parkside’s central plant to campus buildings. As part of this project, KSingh analyzed the… Read the full article.

Childrens hospital

Children’s Hospital Tunnel Extension

KSingh provided civil and structural engineering services for this project which involved the utility distribution design for extending steam and chilled water to accommodate the future expansion of the Children’s… Read the full article.

milwaukee regional medical center

Milwaukee Regional Medical Center Utility Distribution

KSingh was retained by MRMC to provide survey, civil engineering, storm water management, and geotechnical engineering services for this $150 million dollar utility distribution project. The project consisted of installation… Read the full article.

State Fair Park Sewer reconnection

State Fair Park Sewer Reconnection

KSingh was retained by the Division of Facilities Development to prepare a sewer reconnection design study on the State Fair Park Fairgrounds. KSingh completed a concept design study that connects… Read the full article.

Greenfield Law Enforcement Center

Greenfield Law Enforcement Center

KSingh’s team provided site and civil engineering services for a new Law Enforcement Center in the City of Greenfield. Parking lots, driveways, sidewalks, and storm water BMPs were designed to… Read the full article.

St. Joseph Hospital Fuel System Replacement

St. Joseph Hospital Fuel System Replacement

KSingh led the design and installation of two 20,000-gallon USTs at the northeast corner of St. Joseph Hospital in the City of Milwaukee to meet the future projected fuel capacity… Read the full article.