Gavin Petro

KSingh was retained by Gavin Petro to manage the emergency environmental response due to a break of an underground gasoline supply pipe at their facility. As part of an emergency response, the gas station was shut down while repairs were made to the product piping, a program of vapor mitigation was implemented, free product and contaminated groundwater was pumped from the sump crock, and a vapor monitoring program of the effective residence and surrounding buildings was implemented. The project required significant coordination with the several departments of the City of Milwaukee, and the WDNR in order to close the site.

Location

Milwaukee, WI