Blog Archives


Basin H Central MIS

Basin H Central MIS

Former Walker Manufacturing

Former Walker Manufacturing

KSingh was retained to design a multi-phased, $75 million development on the lakefront in Racine. KSingh’s role on the project was land surveying, civil engineering, environmental engineering, and geotechnical engineering…. Read the full article.

MMSD Greenfield Park Force Main

Greenfield Park Force Main

Milwaukee Metropolitan Sewerage District retained KSingh to design for the rehabilitation of the 24-inch cement–lined ductile iron force main on South 124th Street. The force main is approximately 2,813 feet… Read the full article.

Milwaukee County Historical Society

Milwaukee County Historical Society

KSingh was retained by Milwaukee County, as a part of a team, to provide exterior renovation design services for the Milwaukee County Historical Society Museum (Historical Center). KSingh provided settlement… Read the full article.

USH and Watertown Plank Road interchange sewer

Milwaukee County Storm Sewer Condition Assessment

KSingh worked as part of a team to perform a condition assessment of the Storm Sewer System on Milwaukee County Grounds. The project location were the quadrants of the USH… Read the full article.

matc oak creek

MATC Oak Creek

The MATC Protective Services Division project involved the design of an approximately 10,000 square foot parking lot and vehicle storage out-building at the MATC Oak Creek Campus.

uw madison engineering building

UW Madison Engineering Drive Utilities

KSingh was retained by the State of Wisconsin Department of Administration and UW-Madison as part of a team to provide civil engineering and land surveying services for this advanced planning… Read the full article.

winnebago mental health institute

Winnebago Mental Health Institute

KSingh was retained by the Division of Facilities Development as part of a design team led by HGA to provide civil engineering, geotechnical engineering, and land survey for this $13… Read the full article.

UW madison sellery hall

UW Madison Sellery Hall

KSingh was retained as part of a team to design the replacement of steam lines on Park Street and Johnson Street on UW’s campus. This involves replacement of several pits… Read the full article.

mendota mental health institute

Mendota Mental Health Institute

KSingh was retained as part of a team by the Division of Facilities Development to provide survey, civil, geotechnical and structural engineering services for this utility relocation project at Mendota… Read the full article.

STH roadway bridges

STH 145 Roadway & Bridges

KSingh was retained by WisDOT to perform construction inspection on this project along Fond Du Lac Avenue from County Line Road to 68th Street in Milwaukee County. This project included… Read the full article.

STH reconstuction

STH 59 Reconstruction

KSingh provided construction management services for an $8.5 million reconstruction of STH 59 in the City of Whitewater. This project was built in three stages over two years to improve… Read the full article.

STH reconstruction

STH 36 Reconstruction

KSingh performed construction inspection of the $9 million STH 36 (Milwaukee Avenue) Reconstruction project from STH 20 to CTH Y in Racine County. This project consisted of milling and paving… Read the full article.

STH reconstruction

STH 32 Reconstruction

KSingh was retained by the Wisconsin Department of Transportation to provide construction management services for the $6.1 million urban reconstruction along STH 32 in the City of Racine. The work… Read the full article.

layton avenue reconstruction

Layton Avenue Reconstruction

KSingh was retained by Milwaukee County to lead the construction management of a 1.1-mile corridor from S. 27th Street to W. Loomis Drive on Layton Avenue in Greenfield. The work… Read the full article.

Lake Butte de Morts Bridge

Lake Butte de Morts Bridge

The KSingh Team was retained to oversee the filling of Lake Butte des Morts and construction of Lake Butte des Morts Drive. Construction was completed ahead of schedule and with… Read the full article.

CTH F new alignment

CTH F New Alignment

KSingh provided construction management on a new alignment of CTH F in the City of Twin Lakes in Kenosha County. The purpose of the new alignment was to make it… Read the full article.

water street demolition inspection

Water Street Demolition & Inspection

The Redevelopment Authority of the City of Racine retained KSingh to provide technical specification and plan creation services for the deconstruction, demolition, and abatement of 12 structures on the former… Read the full article.

milwaukee street car

Milwaukee Streetcar The Hop MKE

KSingh was retained by the City of Milwaukee as part of a team to perform a Phase 1 Hazardous Material Assessment for the extension of the Streetcar from the existing… Read the full article.

milwaukee county inspection

Milwaukee Regional Medical Center Inspections

KSingh has been providing civil engineering inspection services for Milwaukee County for several years. Recent projects have included the N. 87th Street Reconstruction project and the Froedtert Hospital Parking Garage… Read the full article.