KSingh was retained by Gavin Petro to manage the emergency environmental response due to a break of an underground gasoline supply pipe at their facility. As part of an emergency… Read the full article.
KSingh provided civil engineering for the redevelopment of a former tire shop into a Blaze Pizza restaurant facility. The building is a 2,400 square foot facility is on the corner… Read the full article.
KSingh was retained by a developer to provide civil engineering and land surveying services for this 2,400 square foot building on Greenfield Avenue in the City of West Allis. KSingh… Read the full article.
KSingh was retained to provide civil and structural engineering services for the renovation and expansion of the Wauwatosa location of Camp Bar. This project involved the addition of Birch, an… Read the full article.
This project involved the civil design for an existing site that was redeveloped into a 970 square foot Aspen Dental facility on a 0.45-acre lot in West Allis, WI.
KSingh was retained by MRMC to provide survey, civil engineering, storm water management, and geotechnical engineering services for this $150 million dollar utility distribution project. The project consisted of installation… Read the full article.
As part of the IH 39/90 South Segment team, KSingh was tasked with providing structural engineering for the replacements of the Woodman Road and Hart Road overpass bridges. The existing… Read the full article.
KSingh was retained to provide construction management services for the new roundabout at the intersection of CTH H and Bain Station Road in the Village of Pleasant Prairie in Kenosha… Read the full article.
KSingh was retained by WisDOT’s Southeast Region to perform three different construction management projects from the Washington County Line to the USH 41/45 split. This $24 million project required multiple… Read the full article.
KSingh provided structural engineering services for the renovation of the Charles Allis Art Museum in Milwaukee, WI. KSingh’s scope of services included the structural design of the repair and replacement… Read the full article.
KSingh provided master planning services for future developments at the Milwaukee County Zoo. As a part of this project, KSingh provided the design of the West entrance, new facility exhibits… Read the full article.
KSingh provided civil and structural engineering services for this project which involved the utility distribution design for extending steam and chilled water to accommodate the future expansion of the Children’s… Read the full article.
KSingh was responsible for the civil engineering, traffic engineering, stormwater management, and associated permitting for the new 1-story, 4,200 square foot Co-Op Credit Union in Onalaska, Wisconsin.
Scope of Services Preliminary and Final Design Drainage & Detention Right of Way Plat/Slopes Geotechnical Report Hazmat Investigation Phase I Wetland Delineation Environmental Documents Utility Coordination Public Involvement Signalized Intersection… Read the full article.
KSingh provided structural engineering for the replacement of the CTH D Bridge in the Village of Rochester. The bridge was closed during construction and there were several unique design challenges… Read the full article.
KSingh was retained to provide bathymetric survey services for Milwaukee County’s South Shore Park Parking Lot Improvements project. The KSingh team provided these services successfully and the end result was… Read the full article.
KSingh was retained by WisDOT to provide construction management services for two IDs in the City of Delavan in Walworth County. This project consisted of the milling and overlaying of… Read the full article.
KSingh was retained by the City of Janesville and WisDOT for the design of the replacement of the Sharon Road Bridge over Spring Brook Creek. The existing structure was a… Read the full article.
KSingh was retained by the Division of Facilities Development to prepare a sewer reconnection design study on the State Fair Park Fairgrounds. KSingh completed a concept design study that connects… Read the full article.
Designed foundations for a new storage facility adjacent to an existing warehouse. Three new buildings to be constructed Coordinated foundation work with light gage metal framing Performed additional services… Read the full article.